Obviously this is dependent on the size of the kitchen and the complexity and specification of the equipment within. If all of the services are in place and ready for the catering equipment to be connected, installation can take as little as 1-3 days for a small to medium sized restaurant kitchen and longer for larger catering facilities such as hotels and production kitchens. Complete turn-key commercial kitchen refurbishments where everything including all the mechanical and electrical services, ventilation, interior finishes and catering equipment are installed can take 3-6 weeks from start to completion depending on the complexity of the site and the scope of works. Detailed works programmes are issued with all turn-key commercial kitchen refurbishments showing every stage of the refurbishment and the completion date.Please see example below.